About us

1974

Altes Firmengebäude
  • Establishment of the factory by Dipl.-Ing. Horst Ullmann

  • Start of fabrication with 6 workers in Kempten-Hegge  in a rent house. The fabricated tanks are designed for clients in the food and dairy industry

1981

  • Start with fabrication in a new constructed Building in Kempten-Ursulasried

  • The new factory includes an aerial of 13.000 m². The fabrication building of 1500 m² includes a fabrication tower with a height of 20,0 m and a new office building

1990

Neues Firmengebäude
  • Extension of the factory area and construction of a new fabrication building with a size of 750 m². The number of employess raised to 40 people

2000

  • In second-generation, Dipl.-Ing. Wolfgang Ullmann was appointed to the company management with the responsibility for the sales department

2009

  • 35th company anniversary

2010

Erweiterung Produktionshalle
  • Extension of the 1990 built fabrication building from 750 m² to 1.300 m²

2012

Aufstockung Bürogebäude
  • Hightening of the office building

2013

Aufstockung Sozialgebäude
  • Hightening of social building

2014

  • 40th anniversary of Ullmann & Co. Factory

Tanks - Silo-plants - process engineering - Stainless steel plant engineering and construction